Data Center Construction Market in Southeast Asia to grow at a CAGR of 14.8% during 2016-2020
About Data Center Construction Market in South East Asia
The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general construction works.
The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises are focusing on the building of green data center facilities to reduce power consumption and carbon dioxide emissions.
Technavios analysts forecast the data center construction market in Southeast Asia to grow at a CAGR of 14.8% during the period 2016-2020.
Browse Market info, get a Sample PDF with TOC: http://www.researchmoz.us/enquiry.php?type=S&repid=685255
Covered in this report
The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.
The market is divided into the following segments based on electrical construction:
UPS
Energy storage equipment
Generators
Transfer switches and switchgear
Technavio's report, Data Center Construction Market in South East Asia 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Click to submit Query/ Enquiry: http://www.researchmoz.us/enquiry.php?type=E&repid=685255
Table of Content
PART 01: Executive summary
Highlights
PART 02: Scope of the report
Market overview
Top-vendor offerings
PART 03: Market research methodology
Research methodology
Economic indicators
PART 04: Introduction
Key market highlights
PART 05: Market landscape
Market overview
Market size and forecast
Five forces analysis
PART 06: Market segmentation by electrical construction
UPS systems
Energy storage equipment
Generators
Transfer switches and switchgear
Others
About ResearchMoz
ResearchMoz is the worlds fastest growing collection of market research reports worldwide. Our database is composed of current market studies from over 100 featured publishers worldwide. Our market research databases integrate statistics with analysis from global, regional, country and company perspectives. ResearchMozs service portfolio also includes value-added services such as market research customization, competitive landscaping, and in-depth surveys, delivered by a team of experienced Research Coordinators.
Contact Us:
Mr. Nachiket
Albany NY - 12207
United States
Tel: +1-518-621-2074
Tel: 866-997-4948 (Us-Canada Toll Free)
Email: sales@researchmoz.us
Latest Press-Releases: http://www.researchmoz.us/pressrelease