Marketing-Börse PLUS - Fachbeiträge zu Marketing und Digitalisierung
print logo

Transport minister follows up 1st line of high-speed train

Kamel el Wazir checked on the workflow of the first line of the High Speed Rail network project (Ain Soukhna / El Alamein / Matrouh / Fayoum).
05.09.23 | Source: Egypt Independent

The minister’s tour began by monitoring the implementation rates of the South Helwan Bridge on the Nile from Al-Tebeen Road (extension of the Nile Corniche) to the Cairo-Aswan Agricultural Road with a length of 2.52 km and a width of 13.66 m and an extension with a width of 28.66 m, according to a statement by the Transort Ministry.


The minister then inspected the Cairo station in Helwan, which serves the city of Helwan, the city of 15 May, and all areas south of Cairo.


 

FREE NEWSLETTER