MRP Manager “Material Requirements Planning”
Major job responsibilities:
1- Maximize the efficiency of the material cycle
2- Manage the material process in a way to have it on the right time.
3- Coordinate the overall process in order to reach the optimum inventory process through reliable planning
Skills
Education: Engineering
Experience: MRP within similar industry “Transformers” with Min. five years Exp.
English lang. + oracle exp
Education
Engineering Degree
Preferences: Male, Egyptian or Indian Nationality
Basic Data
OfferMRP Manager “Material Requirements Planning”
Online since:
26.07.2011
Available until:
Apply until:
30.11.2010